Taian

icon
Population
1
MILLION
icon
MSW treated
0.39
MIO T/YR
icon
Area
130
km²

The project boundary of Taian City includes Taishan and Daiyue Districts, covering an area of 130 square kilometres and having a total of 1 million residents. The Taian Environmental Sanitation Office under the Municipal Management Bureau is the authority responsible for waste management. According to the statistics, the amount of MSW generated in Taian in 2016 was about 392,300 tons (1,075 tons per day).

Performance of Taian
MSW management system in 2018

  • 1.1 Waste collection coverage (%)
  • 1.2 Waste Captured
    by the System (%)
  • 1C Quality of waste
    collection services
  • 2 Controlled
    treatment
    and disposal (%)
  • 2E Degree
    of environmental
    protection in waste
    treatment and disposal
  • 3 Recycling rate
    (%, formal system)
  • 3R Quality of 3Rs (reduce, reuse, recycle) provision
  • 4U User inclusivity
  • 4P Provider inclusivity
  • 5F Financial sustainability
  • 6N National solid waste management framework
  • 6L Local institutional coherence

GHG emissions from the waste sector*

GHG IN TONS
  • Business-as-usual (BAU) scenario (tCO2e/y)
  • Integrated Waste Management (IWM) Scenario (tCO2e/y)
* the GHG emissions data provided for the year 2022 (both BAU and IWM Scenarios) is indicative. The emissions associated with the IWM Scenario are forecasted by the project team on the basis of activities that are to be implemented within the scope of the IWM NAMA project along with the actions planned by the local authorities independently. Every year, the actual data on emissions will be updated as result of GHG emissions monitoring and published on the website under the IWM Scenario. The GHG emissions associated with the BAU Scenario will also be updated annually taking into account the amount and composition of waste generated by each demo-city within the project boundary.